Short Lead Time for Buckle - The AC-O-05,AC-O-08 and NF0810 Dead End Clamp – Yongjiu

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With our excellent administration, strong technical capability and strict excellent control method, we carry on to offer our clients with responsible good quality, reasonable costs and great companies. We intention at becoming considered one of your most responsible partners and earning your pleasure for Cable Termination Kits, Earth Clamp, Electrical Cable Lug, We honor our core principal of Honesty in business, priority in company and will do our greatest to provide our customers with high-quality goods and fantastic provider.
Short Lead Time for Buckle - The AC-O-05,AC-O-08 and NF0810 Dead End Clamp – Yongjiu Detail:

The AC-O-05 UV Protect Dead End Clamp is designed for a fast, easy and reliable dead-ending of fiber optic cables on access networks with spans up to 100 m.

A pair of wedges grips the cable automatically within the conical body.

No special tools are required.

•   Standard: NFC33-042

Dead End Clamp

 

Item No.

Cross Section(mm2)

Conductor(mm)

Breaking Load(KN)

AC-O-05

16-25

3-7

3

AC-O-08

16-25

6-8

4

AC-O-10

16-25

8-10

5

Dead end clamp has high strength and reliable grip.
A pair of wedges grips the cable automatically within the conical body.One core Anchor clamps are design to supporting the neutral messenger, the wedge can be self-adjusting.The installation does not require any specific tools and the operating time is drastically reduced.
The stress distribution of anchoring clamp to the twisted wire is uniform. The twisted wire is not damaged, and the anti-vibration ability of the twisted wire is improved.
Simple installation and easy construction.
The quality of the installation of anchoring clamp is guaranteed
Good corrosion resistance, use high quality materials.

And the installation instruction are as followed:
1.Attach the clamp to the pole bracket using its flexible bail.
2.Place the clamp body over the cable with the wedges in their back position.
3.Push on the wedges by hand to initiate the gripping onto the cable.
4.Check the correct positioning of the cable between the wedges.
5.When the cable is brought to its installation load at the end pole,the wedges move further onto the clamp body.When installing a double dead-end leave some extra length of cable between the two clamps.

At the same time, we can also provide customized product services according to customer requirements. Although our product prices are not necessarily the lowest, they must be the most valuable.Any questions just contact us freely.


Product detail pictures:

Short Lead Time for Buckle - The AC-O-05,AC-O-08 and NF0810 Dead End Clamp – Yongjiu detail pictures


Related Product Guide:

We are going to dedicate ourselves to providing our esteemed buyers together with the most enthusiastically thoughtful products and services for Short Lead Time for Buckle - The AC-O-05,AC-O-08 and NF0810 Dead End Clamp – Yongjiu , The product will supply to all over the world, such as: Orlando, Mombasa, Argentina, With the goal of "zero defect". To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.
  • This supplier offers high quality but low price products, it is really a nice manufacturer and business partner.
    5 Stars By Eve from Jeddah - 2018.12.28 15:18
    A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Klemen Hrovat from Slovenia - 2017.10.27 12:12
    Write your message here and send it to us